Study Tour of EEE 4th Year 1st Semester Students to Summit Narayanganj Power Plant

 

Department of Electrical and Electronic Engineering, University of Asia pacific organized a day-long course-based study tour for 4thyear 1st semester students as a part of its co-curricular activities. Thirty (30) students accompanied by two faculty members (JubairSieed, Assistant Professor & Khalid IbneMasood, Lecturer) visited Summit Narayangonj 102Mega Watt Power Plant on 20th June, 2014. Summit Group is the largest private sector power producer of the country with installed capacity of around 700MWin total and 600MW of generation capacity under construction. Students of EEE, UAP visited the group's Narayangonj Power Plant which operates with six HFO fuel based engines with individual capacity of 17MW each. Deputy Plant Manager Mr. Faridul Islam briefed the students about the operating procedures of their plant with animated video and power point presentation. He also explained the queries of the students. Later there was an arrangement of guided tour around the power plant and its different sections such as control room, sub-station, fuel-processing unit, chemical test facility, engine room etc. The plant authority also arranged for light refreshments for the visitors. The tour ended with a vote of thanks from UAP to Summit Narayangonj Power Company Limited. Students received a glimpse of actual power plant experience from this tour which would definitely come out handy in their future endeavors.

pic1

Photo: Students& Faculty Members of EEE with Summit Narayangonj Power Plant Officials.

pic1

Photo: Students of EEE in front of Summit Narayangonj Power Plant Sub-station.

pic1

Photo: Students of EEE in front of Summit Narayangonj Power Plant Control Room.